![]() | Newbuild. Two 600mm diameter Venturi Injectors installed aboard 318,000 DWT VLCC, Korea. 6,000m3/hr main ballast system plus 350m3/hr Aft Peak. |
![]() | Newbuild. Two 500mm diameter Venturi Injectors installed aboard 118,000 DWT Bulk Carrier, China. 4,400 m3/hr VOS ballast water treatment system. |
![]() | Newbuild. One of two 500mm diameter Venturi Injectors installed aboard 118,000 DWT Bulk Carrier, China. 4,400 m3/hr VOS ballast water treatment system. |
![]() | Newbuild. Venturi Injector for segregated Fore Peak VOS ballast water treatment system for 20,000 DWT Chemical Tanker. 1,000 m3/hr VOS ballast water treatment system. |
![]() | Newbuild. Double Block and Bleed and Venturi Injector arrangement on deck 7,700DWT Chemical Tanker. 500m3/hr VOS ballast water treatment system. |
![]() | Retrofit. Single 400mm diameter Venturi Injector (top) installed aboard 5,500 TEU Container Vessel. 1,000m3/hr VOS ballast water treatment system. |
![]() | Retrofit. Single 400mm Venturi Injector (bottom) installed aboard 5,500 TEU Container Vessel. 1,000m3/hr VOS ballast water treatment system. |
![]() | Newbuild. VOS Stripping Gas Generator installed aboard 318,000 DWT VLCC, Korea. 6,350 m3/hr VOS ballast water treatment system. |
![]() | Newbuild. VOS Stripping Gas Generator installed aboard 20,000 DWT Chemical Tanker, Turkey. 1,000 m3/hr VOS ballast water treatment system. |
![]() | Retrofit. Model VOS-1000 Stripping Gas Generator installed on platform in engine spares room 5,500 TEU Container Vessel. 1,000m3/hr VOS ballast water treatment system. |
![]() | Newbuild. Model VOS-500 Stripping Gas Generator ready to leave Mitsubishi Kakoki factory in Japan. |
![]() | Newbuild. Model VOS-4000 Stripping Gas Generator being shipped from Samgong VOS factory in Korea. |
![]() | Newbuild. 318,000 DWT VLCC Aft Peak Tank P/V protection; P/V Valve, Mast Vent Riser, and P/V Breaker. 6,350 m3/hr VOS ballast water treatment system. |
![]() | Newbuild. 20,000DWT Chemical Tanker P/V protection; P/V Valve, Mast Vent Riser, and P/V Breaker. 1,000m3/hr VOS ballast water treatment system. |
![]() | Retrofit. P/V Breaker ready to connect to IG line, aboard 5,500 TEU Container Vessel. 1,000m3/hr VOS ballast water treatment system. |
![]() | Retrofit. Mast Vent Riser and P/V Valve connected to IG line, aboard 5,500 TEU Container Vessel. 1,000m3/hr VOS ballast water treatment system. |
![]() | Newbuild. Fuel pump skid for VOS Model-6000 Stripping Gas Generator. 318,000 DWT VLCC installation 6,000m3/hr main VOS ballast water treatment system plus 350m3/hr Aft Peak system commissioned June 2011 in Korea. |
![]() | Newbuild. VOS Ballast Vent Valves installed aboard 118,000 DWT Bulk Carrier, China. 4,400 m3/hr VOS ballast water treatment system. |
![]() | Newbuild. VOS Ballast Control Panel. 118,000 DWT Bulk Carrier, China. 4,400 m3/hr VOS ballast water treatment system. |
![]() | Newbuild. VOS Ballast Control Panel treatment screen. 118,000 DWT Bulk Carrier, China. 4,400 m3/hr VOS ballast water treatment system. |